Valuation: Magnetite Mines Limited

Market Cap 3.63M 2.53M 2.22M 2.07M 1.91M 3.57M 242M 24.57M 9.62M 120M 9.52M 9.31M 415M P/E 2024
-4.91x
P/E 2025 -2.24x
Enterprise Value 5.34M 3.73M 3.27M 3.05M 2.8M 5.25M 356M 36.14M 14.15M 177M 13.99M 13.69M 610M EV / Sales 2024
116,504,294x
EV / Sales 2025 9,610,419,460x
Free-Float
64.34%
Yield 2024 *
-
Yield 2025 -
Manager TitleAgeSince
Comptroller/Controller/Auditor - 01/01/2010
Corporate Officer/Principal - -
Director TitleAgeSince
Chairman - 23/09/2024
Director/Board Member 66 02/06/2022
Chairman - 26/05/2026
Change 5-day change 1-year change 3-year change Capi.($)
-.--%-.--% - - 2.85M
+1.36%+0.70%+48.89%+30.80% 210B
+2.65%+1.81%+51.19%+36.47% 156B
+0.64%+0.45%+74.40%+142.09% 93.79B
+4.23%-2.14%+72.15%+11.20% 78.96B
-1.33%-5.29%+6.94%+24.33% 58.11B
+0.65%+2.81%+62.91%+33.47% 51.63B
-1.84%+3.19%+78.58%+43.20% 28.83B
-0.04%-3.72%+79.22%+314.27% 25.13B
+1.96%+0.35%+22.89%+67.08% 23.31B
Average +0.88%+0.91%+55.24%+78.10% 80.68B
Weighted average by Cap. +1.39%+0.61%+54.24%+55.40%

Financials

2024 2025
Net sales 0.21 0.15 0.13 0.12 0.11 0.21 14.3 1.45 0.57 7.09 0.56 0.55 24.5 0 0 0 0 0 0 0.08 0.01 0 0.04 0 0 0.14
Net income -4.85M -3.38M -2.97M -2.76M -2.54M -4.77M -323M -32.79M -12.84M -160M -12.7M -12.42M -554M -4.19M -2.92M -2.56M -2.39M -2.2M -4.12M -279M -28.33M -11.09M -138M -10.97M -10.73M -478M
Net Debt -1.1M -764K -671K -625K -575K -1.08M -73.03M -7.41M -2.9M -36.22M -2.87M -2.81M -125M 1.71M 1.19M 1.05M 975K 897K 1.68M 114M 11.56M 4.53M 56.52M 4.48M 4.38M 195M
Logo Magnetite Mines Limited
Magnetite Mines Limited is an Australia-based iron ore company. The Company is focused on the development of magnetite iron ore resources in the highly prospective Braemar iron region of South Australia. Its projects include the Razorback Iron Ore Project and Muster Dam Iron Ore Project. The Razorback Iron Ore Project is a pre-development magnetite iron ore project capable of producing high-grade and Direct-Reduction grade (DR-grade) iron ore products required in low-carbon and zero-carbon steel production. It consists of the Razorback and Iron Peak deposits. It is located just 240 kilometers (kms) northeast of Adelaide in arid, low-intensity pastoral country. The Muster Dam Iron Ore Project is hosted by the same Braemar Iron Formation as the Razorback Iron Ore Project. The Project is located approximately 110 km to the northeast of Razorback Iron Ore Project. The Project produces the required specification of DR-grade, very low impurity products necessary for green iron production.
Employees
-